Student Accommodation, Stoke 2018 (10 Months),
Overall Project Cost £1.05m
The works involved the design and installation of the entire turnkey electrical installation from initial consultation to practical completion.
We designed, installed and commissioned:
- Maximum Demand Calculations
- Complete Containment System
- Sub main distribution
- Small Power
- Plant Power & Control Wiring
- LED Lighting
- Emergency Lighting
- A Fully Addressable Fire Alarm System
- Structured Network Cabling
- Access Controls
- CCTV
- Disabled Toilet Alarms
- Addressable Disabled Refuge Alarm
The project required