Student Accommodation, Stoke 2018 (10 Months),
Overall Project Cost £1.05m

The works involved the design and installation of the entire turnkey electrical installation from initial consultation to practical completion.

We designed, installed and commissioned:

  • Maximum Demand Calculations
  • Complete Containment System
  • Sub main distribution
  • Small Power
  • Plant Power & Control Wiring
  • LED Lighting
  • Emergency Lighting
  • A Fully Addressable Fire Alarm System
  • Structured Network Cabling
  • Access Controls
  • CCTV
  • Disabled Toilet Alarms
  • Addressable Disabled Refuge Alarm

The project required good working relationships with all other trades in order for the works to be completed in the most timely and cost-effective way.